K-12 Schools Project Experience

 

Durham Public Schools 

 

Parkwood Elementary School

Study and Evaluation

Year of Study: 2011

The project involved a building systems (plumbing, mechanical and electrical) evaluation and feasibility study of all five of the existing buildings in this elementary school owned by Durham Public Schools located on Revere Road in Durham. The purpose of the study was to analyze and evaluate the existing plumbing, mechanical and electrical building systems for compliance with applicable state building and/or rehabilitation code requirements and to evaluate the building systems for the remaining useful service life and suitability of future reuse.

 

 

Parkwood Elementary School

Design and Construction

Year of Construction: 2012

Project PME Budget: $5,137,300

The results of the study above resulted in a major renovation of buildings A & B along with some electrical upgrades in Buildings C, D and E.

A new Fire Protection system was installed in Building A in lieu of fire proofing the existing steel.

The HVAC system and controls was completely replaced in Buildings A & B.  New Air Handling Units connected to the Campus Plant were incorporated.  All ductwork, diffusers and controls were replaced. 

The plumbing consisted of a complete replacement in Building B including new fixtures, water lines, waste lines and water heater including hot water recirculation.  Building A consisted of new fixtures, water lines, waste lines, water heater including hot water recirculation and storm water and overflow drains.

The electrical system in Buildings A & B was completely replaced with the exception of the electrical panelboards and the cafeteria branch circuits.  All new lighting and lighting controls were provided in Buildings A & B.  This included new interior emergency lighting as well as exterior emergency lights. 

The existing telecommunication wiring was replaced in Buildings A and B with a complete new cabling system.  A new MDF was built in Building A for the campus along with a new IDF in Building B. 

The existing Pyrotronics hardwired fire alarm system was replaced with a new addressable fire alarm system with partial smoke detection in all five campus buildings. 

A new Security system with motion detectors was added in all five buildings.

 

 

                                                              EK Powe Elementary School
Study and Evaluation
Year of Study: 2011

The project involved a building systems (plumbing, mechanical and electrical) evaluation and feasibility study of an existing two story, elementary school owned by Durham Public Schools located on 9th Street in Durham. The building consisted of the original 1926 construction along with 1966 and 1994 additions. The purpose of the study was to analyze and evaluate the existing plumbing, mechanical and electrical building systems for compliance with applicable state building and/or rehabilitation code requirements and to evaluate the building systems for the remaining useful service life and suitability of future reuse.
 


EK Powe Elementary School
Design and Construction
Year of Construction: 2012
Project PME Budget: $2,213,000

The results of the study above resulted in minor refurbishments of the 1926 and 1966 buildings.
The plumbing consisted of replacing the plumbing fixtures, water lines and waste lines in all eight gang Toilets in the 1926 and 1966 buildings. New plumbing was also provided in a few single bathrooms including new fixtures, waste and water lines.
The HVAC work was very limited in scope. The HVAC coils were cleaned in approximately 100 existing fan coil units. The fan coil units in the Auditorium were replaced.
The electrical work consisted of new lighting and lighting controls in the 1926 and 1966 buildings. This included new interior emergency lighting as well as exterior emergency lights.
Seven panelboards were replaced due to the available fault current being exceeded and/or condition of the panels.
The existing hardwired fire alarm system was replaced with a new addressable fire alarm system with partial smoke detection
The existing Security system was upgraded with new motion detectors in the 1926, 1966 and 1994 buildings.
 

 

Bacon Street

Feasibility Study

The project involves a similar evaluation and feasibility study of an existing single story, approximately 95,000 square foot office/warehouse building owned by Durham Public Schools located on Bacon and Lawson Streets. The purpose of the studies is to analyze and evaluate the existing plumbing, mechanical and electrical building systems for compliance with applicable state building and/or rehabilitation code requirements, evaluate the building systems for the remaining useful service life and suitability of future reuse and to determine the feasibility of renovating portions of the building previously used as classrooms and training rooms to office use.

 

 

Durham School of the Arts

Addition and Renovation

Project involves HVAC, Plumbing, and Electrical design for a 34,000 square foot addition.  Included in the scope are fire alarm and communication design (phone and data), lighting design for a 2500 square foot open connector,  connection of the Art Courtyard storm sewer piping, courtyard lighting and Construction Administration.

 

 

Durham School of the Arts

Carr Building Master Plan

Project included an investigation and condition assessment of the existing plumbing, HVAC, and electrical systems in the Carr Building. An estimate of probable construction cost as it relates to the PME needs of the facility was provided  along with a written report of findings and suggestions related to the mechanical and electrical systems.

 

 

Githens Middle School

Renovation Phase II

This project upgraded the major heating and cooling equipment controls of the school from pneumatic to DDC. Provided water for use at the track field and provided power for score boards.  Construction was completed in 2005.

 

 

Staff Development Center

Sign Lighting

Site improvements including street (identity) sign and sculpture lighting

 

 

 