HealthcareEducationReligiousGovernmentCommercialBIM

 

Home

Profile

On the Boards

Contact Us

Employment

Community

FTP Site

Webmail

Facebook

 

 

 

  

Boiler Plant Upgrades

Duke Regional Hospital

Project involves the design and construction of new vertical water tube boilers in the existing shops area of the Boiler Plant. Also included are chemical treatment, water softeners, and a deaerator, modifications to the existing shops area for sprinkler, fire alarm, electrical, plumbing, HVAC, and general construction and demolition of the four existing fire tube boilers, deaerators, feedwater pumps and one surge tank.

 

Boiler/Generator Replacement

Roanoke Island Aquarium

The two (2) existing hydronic (hot water) heating boilers serving the aquarium facility will be replaced with multiple (two or three) boilers. The exact quantities, types and capacities of the replacement boilers to be used on the project will be determined during advanced planning phase and will take into consideration the most cost effective efficient fuel type (LP gas and/or fuel oil) available at the project site.  The existing 900 kW diesel generator on site currently feeds both NEC 700 Emergency Loads and NEC 702 Optional Standby Loads in the facility using only one automatic transfer switch.  A goal of the project is to both separate the Emergency and Optional Standby Loads while also powering the entire facility on standby power.    This could be accomplished multiple ways by a combination of existing and new generator(s), two automatic transfer switches, one automatic transfer switch for Optional Standby with battery lights to provide emergency lights, etc.

 

Pharmacy Renovation

Duke Regional Hospital

Renovation of approximately 1,500 square feet of space in the existing Pharmacy. The Pharmacy space will be completed in two phases with the new Gowning, IV Prep, Chemo Prep and Ante Room being in Phase 1.   Design includes new HVAC systems for Phase 1 including a new Air Handling Unit (AHU) that is proposed to be located across the corridor in an existing storage room.   Clean rooms will be ISO 7 and ISO 8.

 
  Spring Stoops McCullen Engineering, PA  
  3624 Shannon Road, Suite 102  
   Durham, NC 27707  
  919-403-8000 (Phone) ● 919-403-9030 (Fax)